October 9, 2008 Building Update
The steel is here! Today the steel was delivered and the back half of our building is going up. The steel work should take between 7 and 10 days. Carpentry, plumbing and electrical work are continuing on the job site. Currently, the plan is to pour the concrete slabs by Thanksgiving and to have the walls and roof on by Christmas.