Early this morning the concrete trucks were on site and by noontime the floor of the main sanctuary was poured. The floor for the back half of the building should be poured next week on Tuesday. The carpenters have started framing the walls of the sanctuary. We are hoping to finish the roof and have the outside walls on by Christmas so that the indoor work can continue through the winter.  